Guides Checklist

Quarterly rebate close checklist: reconciling earned, received and booked

A printable close routine for supplier rebates: check the data, recalculate earned, match receipts, age what is owed, book the accrual and file the evidence.

Version 1.1, last reviewed September 19, 2026

Printed with nothing answered, it is a blank form to work through on paper.

Run this close after every rebate period ends, once the late-transaction window in your agreements has passed, and finish it within a fixed number of working days. Supply chain finance owns it. Bring contracting or category management, general accounting, whoever applies cash, and the analyst who owns the purchase data. The output is three figures for every contract and period, with each gap between them explained and assigned to a named person. Score each item yes, partly or no for your most recent close, with the evidence beside it. A yes without evidence counts as partly.

The three figures

Figure What it is Where it goes wrong
Earned What the agreement owes on the period’s purchases, from your own calculation Calculated on incomplete data, or edited to match what the supplier paid
Received Checks, electronic payments, credit memos and free goods matched to a contract and period Recorded but never matched to a period, so the period still reads unpaid
Booked What the general ledger holds: the accrual, the receivable and the credits to cost centers Booked on a cash basis, or credited to one account for the whole system

Keep earned and received apart. Netting them destroys the evidence that a shortfall existed.

Before the close

Measure your baseline first

  • Your last close measured as a baseline: working days from the end of the late-transaction window to sign-off, contracts in scope with all three figures, variances above tolerance with no logged cause, and suspense items past their deadline.

1. Set the cut-off

  • Period end date, late-transaction window and close date confirmed for each contract. A figure read on the day a period ends is provisional.
  • Trigger date confirmed for each contract: purchase order date, invoice date or receipt date.
  • Contracts in scope listed: every agreement with a period ending this quarter, plus annual agreements whose accrual needs updating.

2. Check the data

  • Purchase, invoice and distributor sales tracing files loaded for the whole period, with rows and dollars by supplier tied to the payables subledger.
  • Late invoices, credit notes and rebills dated in earlier periods listed. They belong to the period of their original date and will change a figure you already reported.
  • New facilities, cost centers and ship-to accounts mapped. An unmapped facility drops out of scope without an error.
  • New item numbers mapped to contract products and categories.
  • Unit-of-measure exceptions cleared on unit-based tiers. A box of 20 counted as one unit undercounts by a factor of 20.
  • Purchases through authorized distributors counted as the supplier’s volume, not as competitor volume, on share commitments.

3. Update the contract register

  • Amendments, renewals, extensions and expirations since the last close entered with effective dates. An amendment edits the existing contract. Entered as a second contract, it double-counts the supplier.
  • New agreements added with an owner, period calendar, payment terms and dispute window.
  • Compliance forms, attestations and reports due this period filed, with proof of submission kept. Volume can reach the tier and the rebate still be forfeited over a late form.

Running the close

4. Calculate earned

  • Eligible spend or units totaled by contract term, from the purchase record the agreement names.
  • Tier determined and the clause type confirmed: retrospective, paid on all purchases, or stepped, paid on the increment only.
  • Growth and share results written as a ratio with numerator and denominator, not only a percentage. A share measured against the supplier’s own products alone reads 100 percent every period.
  • Gating commitments tested before the rebates they gate are counted.
  • Year-to-date tiers and true-ups adjusted. Interim quarters on a year-end true-up read zero by design.
  • Every zero explained as either a threshold missed or a data and scope fault.
  • Calculation file saved with the date and the data cut-off.

If a zero has no obvious cause, work through why a rebate reads zero before accepting it. To write one share commitment as a ratio, use the market-share commitment worksheet.

5. Compare with the supplier

  • Supplier statement or calculation requested where none arrived.
  • Comparison made period by period. A check covering three quarters set against a year-to-date total looks about right and proves nothing.
  • Variances above tolerance logged with one cause each: data, tier, eligibility or timing.
  • Disputes opened in writing inside the contract’s window, with line-level detail attached.

Both sides want the agreement paid as written. A line-level comparison settles most differences faster than a letter.

6. Match receipts

  • Every check, electronic payment, credit memo and free-goods shipment matched to contract, term and period.
  • Bank reconciled by received date, earned reconciled by period date. Mixing the two produces false mismatches.
  • Unexplained receipts parked on a suspense list with an owner and a deadline, not applied until matched.
  • Overpayments investigated. They can mean purchases you cannot see, or a different scope on the supplier’s side.
  • Price credits and overcharge refunds kept out of rebate receipts.

7. Age the receivable

  • Earned-not-received listed by supplier, contract and period, aged from each contract’s expected payment date.
  • Past-due items escalated along an agreed path, with dates.
  • Periods approaching the contract’s claim or lookback limit flagged with the deadline.
  • Write-offs supported by the supplier’s calculation, not by the passage of time.

8. Book and allocate

  • Accrual true-up journal prepared: the rebate on cumulative eligible purchases at the tier judged probable, less the amount accrued to date.
  • Credits allocated to cost centers and facilities in proportion to their eligible purchases.
  • Supplier rebates, group purchasing fee share-backs and local-agreement rebates kept in separate accounts.
  • Tier judgment signed by supply chain, entry signed by accounting.

An illustrative contract: $120,000 earned to date, $100,000 accrued and $90,000 received. The close posts a $20,000 true-up and leaves a $30,000 receivable to age. The estimating method is covered in rebate accruals for hospital finance; agree it with your auditors.

9. File the evidence

  • One folder per contract and period: terms in force, calculation file, purchase detail, supplier documentation, remittance, payment proof and dispute correspondence.
  • Figures exported as signed off. Late data will move them, and the export is the only record of what you approved.
  • Group purchasing organization’s annual written fee disclosure reconciled to share-backs received, when it arrives.

This file also supports the Medicare cost report. 42 CFR 413.98 treats discounts and allowances received on purchases as reductions of the costs they relate to, not as income. Among the conditions of the discount safe harbor at 42 CFR 1001.952(h), a buyer that files a cost report must report the discount fully and accurately and, on request from HHS or a state agency, provide the information the seller gave it. Paragraph (j) has a group purchasing organization disclose to each provider member in writing, at least annually, what it received from each vendor on that member’s purchases. This is a summary, not legal or accounting advice: ask your reimbursement and compliance teams how these rules apply to a specific arrangement.

Measuring and reporting

10. Look forward and report

  • Gap to next tier and current pace listed for each open period. Label it as pace, not a promise.
  • Commitments running short assigned to category managers and service lines, with actions and dates.
  • One page for the chief financial officer and supply chain leader: earned, received, booked, open disputes, dollars at risk, recoveries to date, and restatements of earlier periods with their cause.

For one contract at a time, the rebate tier pace worksheet works out the current pace and the gap to the next tier from your own numbers, in your browser.

What good looks like

  • The close finishes inside its target every quarter, for example 15 working days after the late-transaction window shuts.
  • Every contract in scope shows all three figures, and every variance above tolerance has a logged cause and an owner.
  • The suspense list holds nothing past its deadline.
  • No dispute was opened outside a contract window, and no compliance form went in late.
  • Anyone on the team can produce the calculation behind a payment within an hour.
  • Where this is built in

    Rebate Recovery builds many of these checks into the everyday work instead of a yearly audit. Checks every supplier rebate contract against what you actually bought, then shows what suppliers owe you today, what this period is on pace to pay, and what is still within reach before it closes.

What changed in version 1.1

  • Grouped into phases, added a baseline step and the rule that a yes needs evidence, and made every item answerable on this page.

See what your contracts already owe you

Bring one supplier contract and a purchase extract. In a working session we load it, run the numbers and hand you the statement: earned, received, owed.